Knit turtleneck sweater

Instructions for a turtleneck in size S / M / L

Time spent: about 30 hours

Difficulty: medium

Material: 300/300/400 g offwhite color 0002 "Airolo" (100% pure new wool, running length 150 m / 100 g), 100/150/150 g offwhite color 0094 "Alice" (46% cotton, 22% polyamide, 18% alpaca, 14% wool, running length 115 m / 50 g), 150/150/200 g off-white color 0094 "Malou" (70% alpaca, 20% polyamide, 10% wool, run length 65 m / 50 g), 300/300/400 g off-white color 0094 "Sophia" (87% alpaca, 13% pure new wool, running length 50 m / 100 g), 50/50/50 g off-white color 0094 "mohair luxe" (77% mohair, 23% silk, running length 175 m / 25 g), 150/150/200 g offwhite color 0094 "Kim" (68% virgin wool, 29% alpaca, 3% polyester, length 50 m / 50 g), 50/50/50 g silver-wool white color 0094 "Malou Luxe "(54% alpaca, 23% polyamide, 14% wool, 9% polyester, run length 115 m / 50 g) by Lang Yarns, knitting needles nos. 6 and 7 (if you knit loosely) or 7 and 8 (if you are tight knit - it is important that you come to the information in the stitch test).

Bundmuster (BM) with thin needle: 1st round: 2 sts left, 2 sts to the right. 2nd R: Knit the sts as they appear. Always repeat the 2nd R

Basic pattern (GM) with thick needle: 1st to 4th R: Knitting with Alice Alice on the right (in rows always M). 5th to 8th R: Knit Smoothy with Malou right (front right M, back left st). 9th through 12th round: Knitting with Sophia on the left side (front left side M, back side right side M). 13th to 14th R: Work four times with a thread of mohair luxe on the right side (always in M ​​rows). 15th-18th R: Knitted with Kim right (front right M, back left M). 19th to 20th round: Knitting with Malou Luxe on the left (always in rows M). 21st to 26th R: Knit with a double thread Airolo in a pear pattern (alternately 1 st on the right, 1 st on the left, staggered in the following rows). Repeat 1st to 26th Rs.

Mesh test (GM): 11 M x 16 R = 10 x 10 cm.



Back: Stitch with thin needle and double thread Airolo 60/64/68 sts and knit 5 cm in BM. Continue with thick needle in the GM knit. 40/39/38 cm from BM on both sides mark the beginning of the armholes. 18/19/20 cm from the mark of the armholes for the shoulder bevel bind off on both sides in each 2nd row for size S 2 x 2 + 5 x 3, size M 7 x 3, size L 5 x 3 + 2 x 4 sts. At the same time 4 cm from the beginning of the shoulder bevel for the neckline bind off the middle 12 sts and finish both sides separately, at the neckline bind off 2 sts 2 times 2 times 1 st 1 st in every other row.

Front: While knitting the back piece, bind off the center 6 sts at the same time as the beginning of the shoulder and finish both sides separately, then bind off 2 x 2 + 4 x 1 sts on each side of the neck, and slant the shoulders as in the back ,

Sleeve: Using a thin needle and double thread, cast on Airolo for 28 sts each time and knit 5 cm in BM. Continue to knit with a thick needle in the GM, for the arm bevel on both sides for size S every 10th R 5 x 1, size M every 8th R 6 x 1, size L every 7. R 7 x 1 st = 38/40 / Cast off 42 cm 38 cm from BM all sts.

elaboration: Close the shoulder seams and pick up at the neckline with a thin needle and Kim 60 sts and knit 10 cm in the BM, then knit 12 cm with Malou, then cast off all sts loosely. Close the side seams. Close the sleeve seams and sew in the sleeves.



© Fredrik Magnusson

Knit Easy Going Knit Pullover in Bernat Roving by Kristen Mangus (May 2024).



Knitting pattern, roll collar sweater, material mix, GM, yardage, new wool, alpaca, long yarn, knit, instruction, do it yourself, knitting pattern, wool, turtleneck, material mix, pullover, pullover, rolli